Post Reply 
Incorrect Track Number being passed to control point
28-02-2019, 14:16
Post: #13
RE: Incorrect Track Number being passed to control point
I need to retain disc number so I can run verify passes with CUETools. If I'm making global changes (like changing track number from 1-x per release to 1-x per disc, and thus filename conventions to [DiscNumber].[TrackNumber]....), before I perform a full backup I'll typically run a verify pass to make sure nothing has been screwed up e.g. forgot to change the filename references in the .cue sheets.
Find all posts by this user
Quote this message in a reply
Post Reply 


Messages In This Thread
RE: Incorrect Track Number being passed to control point - simbun - 28-02-2019 14:16

Forum Jump:


User(s) browsing this thread: 1 Guest(s)